Draft Reports
2
Submitted Reports
2
Approved Reports
3
Completion Rate
38%
Turbine Blade Crack Inspection
ApprovedINS-001
Inspector: Alice Johnson
Date: 2023-10-26
Weld Integrity Analysis
SubmittedINS-002
Inspector: Bob Williams
Date: 2023-10-28
Pressure Vessel Thickness Measurement
DraftINS-003
Inspector: Charlie Brown
Date: 2023-10-29
Pipeline Corrosion Assessment
OverdueINS-004
Inspector: Diana Prince
Date: 2023-10-20
Structural Bolt Tension Verification
ApprovedINS-005
Inspector: Ethan Hunt
Date: 2023-10-25
Boiler Tube Leak Detection
SubmittedINS-006
Inspector: Alice Johnson
Date: 2023-10-30
Generator Rotor Vibration Analysis
DraftINS-007
Inspector: Frank Martin
Date: 2023-10-31
Heat Exchanger Fouling Report
ApprovedINS-008
Inspector: Grace O'Malley
Date: 2023-10-27